800.367.6515
9:00 AM to 5:30 PM Office Closed
Menu

5872 Whitebark Dr. $584,900

MLS#: 2607687
Address: 5872 Whitebark Dr.
City / Zip: Myrtle Beach, SC 29577
Type: Residential / Detached

2148

SQ Ft

4

Bedrooms

3

Bathrooms

Overview

Click the main image above for larger images

Highly motivated seller! Welcome to the Annandale model, ideally situated on a scenic water lot and showcasing timeless Southern charm. The spacious front porch offers a welcoming setting to relax and enjoy the surrounding views. Located in The Preserve at Pine Lakes, a coastal lifestyle community set alongside Myrtle Beach’s oldest golf course, this home offers a peaceful setting with a blend of wooded and water views, while remaining conveniently close to area attractions. The home features a well-designed, flexible floor plan with numerous upgrades throughout. The kitchen is appointed with granite countertops, a tile backsplash, stainless steel appliances, and upgraded cabinetry. Additional features include tile flooring in the bathrooms and laundry room, a tankless water heater, and a gas range. A two-car garage and a covered lanai provide both convenience and comfortable outdoor living space, while the fenced backyard offers added privacy and functionality. Situated approximately 1.5 miles from the beach, the property also offers easy access to shopping, dining, and entertainment, all within a short golf cart ride. This home presents an excellent opportunity to enjoy a balance of comfort, style, and coastal living. Ask about seller credits.

This listing is provided courtesy by Stephen Hand, RE/MAX Southern Shores

Mapp

Map may not be 100% accurate.

Amenities

    Property Amenities

    • Interior Features

      • Tray Ceiling(s)
      • Garden Tub/Roman Tub
      • Handicap Access
      • Main Level Primary
      • Split Bedrooms
      • Separate Shower
      • Vanity
      • Walk-In Closet(s)
      • Window Treatments
      • Breakfast Bar
      • Stainless Steel Appliances
      • Solid Surface Counters
    • Utilities

      • Cable Available
      • Electricity Available
      • Natural Gas Available
      • Phone Available
      • Sewer Available
      • Underground Utilities
      • Water Available
    • Flooring

      • Carpet
      • Luxury Vinyl
      • Luxury VinylPlank
      • Tile
    • Appliances

      • Dishwasher
      • Disposal
      • Microwave
      • Range
      • Refrigerator
      • Range Hood
      • Dryer
      • Washer
    • Cooling

      • Central Air
    • Heating

      • Central
      • Gas
    • Foundation

      • Slab
    • Exterior Features

      • Fence
      • Sprinkler/Irrigation
      • Patio
    • Parking

      • Attached
      • Garage
      • Two Car Garage
      • Garage Door Opener
    • Porch / Balcony / Deck

      • Front Porch
      • Patio
      • Porch
      • Screened
    • Waterview / Front

      • Pond

Want To Know More About This Listing?

Leave this field empty

Fill out the form below to get more information.

*
*
*
*
*

Additional Information

Nearby Schools Mortgage Calculator